One workspace
A single AI-native workspace for all your project-finance work.
Build and run the full project-finance model. Connect the deal documents. Let Fi take the analysis, updates, and materials that follow.
A single AI-native workspace for all your project-finance work.
Follow the figure to its input and source page.
Approve model changes and outgoing drafts.
Set the model view, redaction and permissions.
Maya C.
Modules · EPC (BOS & installation) · COD · P50 yield · Monthly shape
Supplier B case: 19.05% vs 18.50% Base (+0.55 pp). The module saving is outweighed by installation and the later COD; the 8760's higher yield carries the case.
Take it anywhere
Send the IC update?Kept as a draft. Nothing sent.
To Investment committee
Sunfield 150 · Supplier B module switch
Sunfield 150 · Module selection.pptx
Supplier B case: 19.05% vs 18.50% Base (+0.55 pp). The module saving is outweighed by installation and the later COD; the 8760's higher yield carries the case.
Each source applied in turn, in the order shown.
5 changes ready for review · Sponsor IRR 18.50% → 19.05% (+0.55 pp). Send the IC update?
Sunfield 150/Supplier B case
CapEx
Schedule
Energy
SUPPLIER B · MODULE SUPPLY QUOTATION
Quotation Q-2611-SF150 · Issued 14 October 2026 · Valid 60 days
4. Pricing
| Line | Basis | Price |
|---|---|---|
| Module supply, delivered to site | per Wdc | $0.252/Wdc |
| Quantity | MWdc | 150.0 |
| Total | $37,800,000 |
Prices are fixed for the validity period and exclude installation, which is by the EPC contractor.
2 / 2Daniel O. · Kestrel Ridge Constructors, Inc.
To Maya C. · 20 Oct 2026
Maya,
Thanks for sending the Supplier B datasheet. We have re-run installation against the 620 W bifacial module on the same single-axis tracker.
The larger-format glass-glass modules need more installation labour per MW and an additional string run per row. Installation and BOS increase by $5,400,000. With Supplier B's delivery window ending in week 22 of 2028, mechanical completion moves, and we would revise guaranteed commercial operation to 31 December 2028 (from 30 September 2028).
Everything else in our current price holds. We can document both changes in a change order once you confirm the module.
Daniel O.
Project Director, Kestrel Ridge Constructors, Inc.
8,760 hourly values
Current module 8760288,798MWh
Supplier B 8760303,815MWh+5.2%
This saves a new Working version
Sunfield 150 is a fictional project. Figures are recorded proj.fi engine outputs.
Size financing, test PPA terms and keep the model aligned with the documents. Fi prepares the analysis and committee materials.
| Input | Value | Source |
|---|---|---|
| Modules | $0.252/Wdc | Supplier B module quote.pdfp. 2 |
| EPC (BOS & installation) | $0.676/Wdc | Fi · approved |
| COD | 31 Dec 2028 | Re: Sunfield 150 installation and schedule¶2 |
| P50 yield | 2,025kWh/kWp | Sunfield 150 8760 - Supplier B.csv |
| Degradation | 0.40%/yr | Supplier B module quote.pdfp. 1 |
Sunfield 150 · Supplier B case
Reconcile technical reports and contract terms against the sponsor model. Trace assumptions to the source and prepare findings the team can review.
From Sunfield 150 8760 - Supplier B.csv
Sunfield 150 · Supplier B case
Diligence the deal and its data room to find gaps in the model and analysis. Run bespoke debt-sizing sensitivities and test them in plain language. Track covenant deadlines and reconcile sponsor base-case updates.
Add sizing test
Sunfield 150 · Supplier B case
Size scenarios with sculpted debt and tax equity, solved together. Track bring-downs and model updates with ease. Screen assets against your internal criteria, so more of your time goes to the real deals.
| Project | Structure | Flip | Target hurdle |
|---|---|---|---|
| Sunfield 150 | Partnership flip | Year 6 | 8.00% |
| Larkspur 90 | Hybrid | Year 6 | 7.75% |
| Redhawk 200 | Partnership flip | Year 5 | 7.75% |
| Ashgrove 60 | Hybrid | Year 6 | 7.75% |
Portfolio · 4 projects
Bring your next deal into the workspace.